|
Vertical solution provided the beginning-to-opening solution for The Front Climbing Club in Boise, ID. Design, construction, and outfitting.

The Wave.

Note the continuously curved surface.

Padding system by Asana, Vertical Solutions industry partner.

Close up detail of finish work.

Faux rock traverse wall.

Top-rope wall. Sprayed concreete for a rock-like surface.

The beginning of The Wave.

The under layer.

The baltic birch is applied.

The space before Vertical Solutions arrives. This picture was taken from almost the same spot as the first picture on this page.
|